march, 2017

09mar5:30 pm7:30 pmWIB-Greater Boston: Learn the Lab Design and Building Essentials for New and Renovated Labs

more

Event Details

WIB-Greater Boston presents an event for companies moving into their first lab, expanding, or renovating. Join us and learn how to avoid pitfalls in lab planning and design and achieve success with timelines, budget, and compliance. Our speakers will provide a case study and cover issues that are critical for a comprehensive lab move, renovation, and opening. Whether you are a scientist, an operations specialist, a facilities specialist, or management leader at your company, this session will be a valuable primer in lab preparation.

Moderated by Tandee Newman, Manager of Portfolio Operations, Atlas Venture, our panel features:

Walk-Ins Accepted?
Yes*
* – Walk-ins will be accepted at the door until event capacity is reached.

Program

5:30 p.m. – 6:00 p.m. Registration & Networking
6:00 p.m. – 7:00 p.m. Panel Discussion
7:00 p.m. – 7:30 p.m. Networking

Pricing Information
Members: $5
Non-Members: $35

Event Date/Time
Thursday, March 9, 2017
5:30 p.m. – 7:30 p.m. EST

Parking Information
There is a public parking garage across the street from the BDC

Public Transit Information

  • MBTA Subway Service – Silver Line Waterfront: Conveniently located at South Station, take the Silver Line Waterfront (SL2) to the Boston Design Center.
  • MBTA Bus Service #7 City Point to Downtown Crossing (connects with South Station) – Take the #7 to the Summer Street stop at the intersection of Summer Street/Drydock Avenue. Walk down Drydock Avenue and Boston Design Center is the second building on your right.

Maximum Capacity
50

Time

(Thursday) 5:30 pm - 7:30 pm

Location

Creative Office Pavilion, Boston Design Center

One Design Center Place, 7th Floor Boston, MA, 02210

Top
X